★ Enterprise Construction Platform
Know Your Numbers.
Make More Profit.
The only construction platform with AI scope extraction, item-level takeoff, real-time owner transparency, and a native field app — all connected.
AI Scope Extraction
Item-Level Takeoff
42-Second Schedule
Mobile Field App
Real-Time Owner Portal
Photo Verification
Enterprise
Michael Espinosa
Carbone Building Company
Contract Value
$2,847,500
Total Budgeted
$2,614,200
Materials Committed
$892,400
Payroll to Date
$341,800
Profit Buffer
$233,300
Field App — Web Platform Integration
From GC desk to field worker's phone — every assignment, clock-in, and verification connected in real time.
No other GC platform does this end-to-end: GC assigns scope on the web → worker gets it on their phone → clocks in via GPS → submits photo verification → Production Hub updates in real time. One system. No manual re-entry. No phone calls. No spreadsheets.
1
GC Assigns Scope
Web Platform
2
Worker Notified
Mobile Push
3
Clock In + GPS
Field App
4
Photo Verification
Camera Upload
5
Hub Updates Live
Real-Time Sync
Web Platform — GC View
Production Hub
All Tasks Unassigned In Progress
Framing — 2nd Floor East
Jorge Martinez
Clocked In
75%
Electrical Rough-In L3
Danny Kim
Clocked In
30%
Drywall Hang — 1st Floor
Rafael Torres
In Progress
55%
Roof Step Flashing
Peak Roofing Sub
Assigned
10%
Spray Insulation 2F
— Unassigned —
Unassigned
0%
Plumbing Rough-In
Steve Bauer
In Progress
45%
Live Activity Feed
Jorge M.
Clocked in — Framing 2F East
Just now
Rafael T.
Photo submitted — Drywall 1F
2 min ago
Steve B.
Task updated — Plumbing 45%
5 min ago
Peak Roofing
Scope sign-off confirmed
12 min ago
Danny K.
Clocked in — Electrical L3
18 min ago
REAL-TIME
SYNC
VERIFIED
Field App — Worker View
9:42 AM 100%
C
Jorge Martinez
65 Church Street
CLOCKED IN
8:02 AM • GPS Verified
Today's Tasks
Framing — 2nd Floor East
In Progress
Install LVL Header — Unit 3A
Assigned
Framing Inspection Prep
Assigned
Tasks
Photos
Clock
Me
9:42 AM100%
Scope Sign-Off
Roof Step Flashing — Peak Roofing
Assigned Scope
Trade Roofing
CSI Code 07 31 13
Location Main Roof / Attic
Qty 142 LF
Est. Value $3,840
Start Jul 1, 2026
Review Required: By signing, you confirm you have reviewed the scope, quantities, and access requirements before work begins. This creates a legally binding record.
Crew On Site
MR
Mike R.
Lead
Clocked In
TP
Tom P.
Helper
Clocked In
LV
Luis V.
Helper
Not yet
Tasks
Sign-Off
Clock
Me
Field Manager — Labor & Cost
14
On Site Now
112
Hours Today
$4,480
Labor Cost Today
WorkerTaskHoursCostStatus
J. Martinez Framing 2F 6.5h $260
On Site
D. Kim Electrical L3 6.5h $325
On Site
R. Torres Drywall 1F 6.5h $228
On Site
S. Bauer Plumbing 5.5h $275
Late Start
Peak Roofing Step Flash 0h $0
Awaiting Sign-Off
Projects › 65 Church Street — Commercial Build-Out
Project Updates
Saturday, May 31, 2026
AI Assistant — Ask anything about scope, budget, schedule, or RFIs. Drafts responses, identifies risks, generates production schedules in natural language.
Active Tasks
47
Workers On-Site
14
Avg. Completion
62%
Today's Updates
8
All In Progress Assigned Complete
Work ItemStatusProgressAssignee
Framing — 2nd Floor East
In Progress
J. Martinez
Electrical Rough-In — Level 3
Assigned
D. Kim
Drywall Hang — 1st Floor
In Progress
R. Torres
Foundation Waterproofing
Complete
Sub — Baseway
Scope Builder
AI reads your plan set and extracts production scope, quantities, and cost estimates per location. Confirm scope to build your bid and production schedule.
Only Construct AI does this: Upload your plan set and AI extracts every production object by location, trade, CSI code, quantity, and cost. 88 production objects confirmed from 6 sheets in under 2 minutes.
Plans & Documents
Plan Set.pdf Plans
Sheets
6
Prod. Objects
88
Est. Total Cost
$294,798
PM Confirmed
88/88
Locations
65 Church Street Electrical (88)
641 Dakota Trail - Addi... (1)
Attic Space (2)
Front Elevation (3)
Roof (4)
2nd Floor (6)
Basement (5)
1st Floor (8)
Production Scope
Steep-Slope Asphalt Shingle Roofing
Dormer Framing 4x8"
Roof Step Flashing — 142 LF
Spray Insulation 2,400 SF
Wood Framing Exterior 2x6
Waterproofing Foundation
Drywall 5/8" Type-X 1F
General Conditions PM
Front & Side Elevations - Additi... 1/4" = 1'-0"
Drywall 2
Exterior Trim 2
Finishes 2
Framing 4
General Conditions 1
Insulation 1
Roofing 2
Waterproofing 1
Page Total$64,710
Confirmed15 / 15
Item-Level AI Takeoff — COUNT dots, LINEAR polylines, AREA polygons. Not bounding boxes.
Roofing
AREA2,847 SF$18,400
Framing
COUNT3 ea$4,200
Waterproofing
LINEAR142 LF$3,840
Insulation
AREA1,240 SF$7,800
Project Kickoff
Set up your scope and schedule before you go to the field.
88 scope objects confirmed
16 trade anchors set
Ready to generate schedule
42-Second Schedule Generation: AI reads 88 confirmed scope objects and generates a fully sequenced, trade-anchored production schedule. No other platform generates a schedule from scope objects.
Set up your scope 88 confirmed
Plan Upload
Upload plan set — AI extracts every object automatically.
Open Scope Builder →
AI Description
Describe in plain English — AI generates the hierarchy.
Start →
Manual Entry
Add objects one by one with CSI codes.
Start →
Set schedule anchors 16 set
Concrete 06-01 → 06-10
Drywall 06-10 → 06-20
Electrical 06-15 → 10-01
Framing 06-01 → 07-15
Insulation 07-20 → 08-05
Roofing 07-01 → 07-20
Production Hub
VIEW: All TasksCritical PathDelayedActiveUnassigned
COMPLETE
62%
CRITICAL PATH
3 tasks
SCHEDULE DELTA
+2d
IMPACT EVENTS
1
DAYS LOST
2
TASKS COMPLETE
47/76
Trades (8)
All Trades
76 tasks tasks
Concrete
8 tasks
Drywall
9 tasks
Electrical
11 tasks
Framing
14 tasks
Insulation
6 tasks
Plumbing
9 tasks
Roofing
7 tasks
Waterproofing
5 tasks
Digital Sub Assignment + Scope Sign-Off: Assign scope to subs digitally. Subs sign off before work starts — creating a legal paper trail. Field photo verification links back to each production object. No other platform does this end-to-end.
Framing — 2nd Floor East
In Progress
75% • J. Martinez / Self-Perform
Electrical Rough-In L3
Assigned
30% • D. Kim / Sub
Drywall Hang 1F
In Progress
55% • R. Torres / Sub
Roof Step Flashing
Assigned
10% • Peak Roofing Sub
Spray Insulation 2F
Unassigned
0% • — Unassigned —
Plumbing Rough-In
In Progress
45% • S. Bauer / Sub
Schedule Context
Project Schedule
Production CompleteOct 31
Tasks Behind3 tasks
Cause of DelayImpact Events
Critical Path
Active Critical Path
Framing → Insulation → Drywall
Impact Events (1)
Material Delay — Insulation
Spray foam back-ordered 2 weeks. +2d schedule impact.
Float Summary
Zero Float (Critical)3 tasks
1-3 Days Float7 tasks
4-7 Days Float12 tasks
8+ Days Float55 tasks
Schedule
Jun 1, 2026 — Oct 31, 2026
COMPLETE
62%
DAYS REMAINING
88d
DELAYED
3
IMPACT EVENTS
1
AVG FLOAT
4.2d
SCHEDULE REV
Unlocked
COMPLETION
Oct 31, 2026
AI-Generated in 42 Seconds: Natural language → fully sequenced Gantt with trade anchors, critical path, float analysis, and real-time updates from the field app. Schedule lives in the platform — not a PDF.
TASK
JUN 2026
JUL 2026
AUG 2026
SEP 2026
OCT 2026
NOV 2026
Framing — East Wing
Framing — West Wing
Electrical Rough-In L3
Drywall Hang 1F
Roof Step Flashing ⚠
Spray Insulation 2F ⚠
Plumbing Rough-In
Foundation Waterproofing
Concrete Footings
Drywall Tape + Finish
General Conditions
Billing
Enterprise
Manage your pay application to the owner and review subcontractor submissions.
APP NO.
1
Period From
Period To
Retainage %
Net Due This Period
$187,420.00
#CSIDescriptionPartyScheduledPriorThis Period% Complete
101 45 00Quality Control - Building Height Verif.$250.00$0.00$250.00
100%
203 30 00Cast-in-Place Concrete - Footings$29,200.00$0.00$29,200.00
100%
304 21 00Clay Unit Masonry - Chimney$8,500.00$0.00$4,250.00
50%
406 11 00Wood Framing$69,616.00$0.00$34,808.00
50%
506 16 00Sheathing - Floor$4,100.00$0.00$4,100.00
100%
607 31 13Asphalt Shingles - Roofing$18,400.00$0.00$9,200.00
50%
707 21 00Thermal Insulation$12,400.00$0.00$0.00
0%
809 29 00Gypsum Board$24,610.00$0.00$12,305.00
50%
915 10 00Plumbing Rough-In$31,200.00$0.00$14,040.00
45%
1016 00 00Electrical Rough-In$28,900.00$0.00$8,670.00
30%
Owner Portal
Real-time project transparency for your owners — no calls needed.
Real-Time Owner Transparency — No Calls Needed: Owners see live schedule, budget, photos, and pay apps. They approve draws directly in the portal. Eliminates the weekly status call and builds trust faster than any competitor.
Schedule Progress
62%
On Track
Budget Used
43.4%
$1.23M of $2.85M
Pending Draw
$187,420
App #1 Submitted
Open RFIs
3
2 pending response
Project Timeline
Mobilization & Site Prep
100%
Foundation & Concrete
100%
Framing
75%
Rough MEP
30%
Insulation
0%
Drywall & Finishes
0%
Final MEP & Fixtures
0%
Punch List & Closeout
0%
Pay Application #1
PeriodMay 1 — May 30, 2026
Contract Amount$2,847,500
This Period$187,420
Retainage (10%)-$18,742
Net Due$168,678
Recent Site Photos
Framing — 2nd Floor
May 29
Concrete Footings
May 27
Roof Step Flashing
May 28
Drywall 1F
May 26
Photo-to-Scope Verification: Every photo links to a production object — timestamped proof of completion.
Inflight
Real-time field operations — assignment, clock-in, photo verification.
Digital Assignment → Sign-Off → Verification: GC assigns scope on web → worker gets it on mobile → sub signs off before starting → field photo links back to production object. Timestamped legal record on every task. No other platform does this end-to-end.
Active Assignments Today
JM
Jorge Martinez
Framing — 2nd Floor East
Clocked In
8:02 AM
DK
Danny Kim
Electrical Rough-In L3
Clocked In
8:15 AM
RT
Rafael Torres
Drywall Hang 1F
In Progress
8:30 AM
SB
Steve Bauer
Plumbing Rough-In
Late Start
9:14 AM
PR
Peak Roofing Sub
Roof Step Flashing
Awaiting Sign-Off
Photo Verifications Today
Framing NE corner 2F
Jorge M.
Complete — Verified
Electrical junction L3
Danny K.
Needs Review
Drywall screw pattern 1F
Rafael T.
Complete — Verified
Plumbing stub-out basement
Steve B.
Complete — Verified
Mobile App
Native iOS & Android apps for every role — field worker, foreman, field manager, and owner. All synced to the web platform in real time.
One ecosystem, every role: GC assigns on web → sub gets scope on phone → signs off before work starts → worker clocks in via GPS → submits verification photo → Production Hub updates live. No other construction platform delivers this complete loop.
Field Worker & Foreman
Daily Tasks
9:42 AM●●● 100%
C
Jorge Martinez
65 Church Street
CLOCKED IN • GPS VERIFIED
8:02 AM • 65 Church St
Today's Tasks (3)
Framing — 2nd Floor East
In Progress
Install LVL Header 3A
Assigned
Framing Inspection Prep
Assigned
☰Tasks
📷Photos
⏱Clock
👤Me
Worker sees only their assigned tasks, clocked-in status, and GPS verification
Scope Sign-Off
9:42 AM100%
Scope Sign-Off
Roof Step Flashing — Peak Roofing
Assigned Scope
TradeRoofing
CSI Code07 31 13
LocationMain Roof
Qty142 LF
Est. Value$3,840
Start DateJul 1, 2026
Review Required: By signing, you confirm scope review before work begins. This creates a legally binding record.
☰Tasks
✓Sign-Off
⏱Clock
👤Me
Sub must sign off on scope details before work begins — legal protection for both parties
Photo Verification
10:14 AM100%
Verify Task
Framing — 2nd Floor East
Linked Scope Object
Wood Framing — Exterior 2x6
CSI 06 11 00 • 2nd Floor East Wing
PHOTO VERIFIED Tap to retake
Notes
Northeast corner framing complete. Ready for inspection.
✓ Submit Verification
☰Tasks
📷Photos
⏱Clock
👤Me
Photo tagged to production object — timestamped proof in every dispute
Field Manager & Executive / Owner
Field Manager — Labor
9:42 AM100%
Field Manager
65 Church Street • Today
14
On Site
$4,480
Labor Today
112h
Total Hours
Crew Status
JM
J. Martinez
Framing 2F
On Site
DK
D. Kim
Electrical L3
On Site
RT
R. Torres
Drywall 1F
On Site
SB
S. Bauer
Plumbing
Late
PR
Peak Roofing
Step Flash
Awaiting S/O
👤Crew
👤Tasks
👤Cost
👤Me
Real-time crew status, labor cost, and assignment management in the field
Executive Dashboard
9:42 AM100%
Portfolio Overview
3 Active Projects • Carbone Building Co.
65 Church Street
On Track
62%
441 Park Ave
1 Delay
38%
Riverside Lofts
On Track
14%
Company Financials
Total Contract Value$8.2M
Profit Buffer$612K (7.5%)
Payroll This Week$87,400
📈Projects
📈Finance
📈Reports
📈Me
Exec sees all projects, profit buffers, and schedule status at a glance
Owner Portal
9:42 AM100%
Your Project
65 Church Street • Owner View
62%
Schedule
43%
Budget Used
$187K
Pending Draw
3
Open RFIs
Timeline
Foundation
100%
Framing
75%
MEP Rough
30%
Drywall
0%
Pay App #1 Ready
$168,678 net due
📈Progress
📈Photos
📈Billing
📈Docs
Owner approves draws, sees live progress and photos — no calls needed
Budget Tracker
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Game Plan
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
aSOV
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Purchase Orders
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Documents
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Photos
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
RFIs
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Submittals
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Change Orders
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Equipment
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Punch List
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Daily Report
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Safety
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Payroll
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Pay Applications
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Lien Waivers
Fully integrated with Scope, Schedule, and Production Hub. All data flows automatically — no manual re-entry, no disconnected spreadsheets.
Assistant
Hello! I'm your Construct AI assistant. Ask me anything about scope, budget, schedule, or RFIs — or ask me to generate a schedule in plain English.
Generate a schedule from the 88 confirmed scope items starting June 1, 2026
Pulling 88 confirmed scope items now. Generating a 9-phase schedule starting June 1, 2026...

Phase 1: Mobilization (Jun 1–5)
Phase 2: Concrete (Jun 1–10)
Phase 3: Framing (Jun 1–Jul 15)
Phase 4: Rough MEP (Jun 15–Oct 1)
Phase 5: Insulation (Jul 20–Aug 5)
Phase 6: Drywall (Jun 10–Jun 20)
Phase 7: Finishes (Aug–Sep)
Phase 8: Final MEP (Sep–Oct)
Phase 9: Punch & Closeout (Oct)

Ready to create?
yes
✓ Schedule created — 76 tasks, 9 phases, 153 days. Critical path: Framing → Insulation → Drywall. Generated in 42 seconds.